



Latest News
Date Posted : Jan 2011
Since the last meeting a significant amount of work has been carried out to redecorate and refresh the Club house bar and surrounding areas:
· Walls and ceilings repainted in Bar, Ante Room and Stairwells
· New hardwearing flooring in anteroom and bar area
· All woodwork repainted
· New curtain rails and curtains
· Pictures hung etc
· Club house thoroughly cleaned and tidied.
· All rubbish removed from the roof space
In addition a new heater has been installed at the foot of the stairs to combat damp (works on a timer) and a new security light fitted outside above the main entrance.
Date Posted : Aug 2011 Full Report Click here
- Improved Security through the fitting of a new lock
- WIFI / internet access
- Repairs to the bar room floor
- A number of electrical jobs
- Significant cleaning and overall tidiness - both inside and outside.
- Two new double sockets fitted by the TV
- New light fitted outside the club house entrance
- New Electric heater fitted in the Ante Room
- Telephone has been cut off and the final payment made saving £250 / year.
- All subscriptions have been received
- Payment has been made for the repair to the floor in the clubroom
- At the start of the year the bank was £5509 in hand and currently stands at £4866
Previous Updates Date Posted : April 2011
- New officers of the club now in place
- Signatories for Club Mandates being organised
- Floor repair
- Security Lighting